No East Midlands Railway trains run between Bedford and London St Pancras on 5 and 6 December. Buses link Bedford and Hitchin while all lines are shut.

No East Midlands Railway (EMR) trains will run between London St Pancras and Bedford on Saturday 5 and Sunday 6 December, because engineering work in the Luton area closes all lines over the weekend, the operator said on 27 November.

Overview

  • When: Saturday 5 and Sunday 6 December.
  • What: No EMR trains between London St Pancras and Bedford. Services from Corby, Nottingham and Sheffield terminate at and start from Bedford.
  • Instead: Rail replacement buses run between Bedford and Hitchin, where passengers can change for Thameslink or Great Northern trains to London.
  • Luton Airport: Journeys “will take much longer than normal”, EMR says.

Getting to London Luton Airport

EMR’s advice for airport passengers that weekend:

  • From the north: change at Bedford for a rail replacement bus to Luton Airport Parkway, then take the DART to the airport.
  • From London King’s Cross: travel via Hitchin, take a rail replacement bus to Luton Airport Parkway, then the DART to the airport.

Pick-up and drop-off points for the buses at Bedford and Hitchin are shown on station signs, or can be found by searching by station on the EMR website.

What the work is

EMR said engineers will be working at various sites near Luton to renew track, install drainage and carry out signalling improvements, alongside further progress on major projects at Luton station and at the freight interchange being built at Radlett.

The operator is urging passengers to check online journey planners before setting out and to allow extra time.

National Rail's video on the Luton engineering work, 5 to 7 December. Video: supplied by East Midlands Railway

What EMR said

Philippa Cresswell, Customer Experience Director for East Midlands Railway, said: “Weekends in the run-up to Christmas are a busy time for travel, and we’re working closely with Network Rail to keep people moving and minimise disruption as much as possible.

“We’re encouraging customers planning journeys to or from London on Saturday 5 and Sunday 6 December to allow plenty of extra time and check their journeys before setting off.

“We thank our customers for their patience and understanding while these important improvement works are carried out.”

With all lines closed, EMR says no trains will run between London St Pancras and Bedford all weekend. Thameslink replacement buses are listed on our Luton roadworks and travel page.

Source: East Midlands Railway press office.